Must be time for that two-story "glass" addition
to the south side of the house, radiant heat floor,
and holes in the floor for the trees. Each *hole*
has to have a concrete "floor" three feet down in.
Did the hole have concrete sides also? And did the concrete floor in the
hole employ radiant heat piping?