Yes, the slight springiness of wood is easier on my hips. A wood shop
floor also allows jigs and braces screwed to the floor as well as full-
size layout drawings. The biggest negative for me is I prefer to hose
out a floor from time to time. Blowing out dust and sawdust is lots
more problematical and vacuuming is more difficult under benches.
When I built a basement under part of this old house I found termite
damage in a big oak beam, so I know they are here. But perhaps the ACQ
stuff will resist them? Or as you suggest, chemically treat the soil
before laying the joists. I have created drainage away from the
building and the dry, rocky soil should be inhospitable to termites.
Use your backhoe to dig out a suitable crawlspace, seal the earth
using an
epdm barrier or the like, ventilate the space and frame your floor.
Way more work and expense than I want. Ventilation would be nigh
impossible.
Another item: I am thinking to pour a concrete ribbon around the
perimeter before any other floor work, both as a screed edge and to
stabilize the posts in case the ACQ does not do what we all hope it
will do and underground post rot occurs. I had thought to run rebar
through the five by five treated posts but then realized that all
fasteners into ACQ needs to be coated or stainless. The rebar would
deteriorate. So then I thought about running the rebar through
galvanized pipe through the posts. Which seems like excessive work and
expense. Don suggests lag bolts on three post faces. What say you guys?
_______________________________________________
Homestead list and subscription:
http://lists.ibiblio.org/mailman/listinfo/homestead
Change your homestead list member options:
http://lists.ibiblio.org/mailman/options/homestead/lurine%40softcom.net
View the archives at:
https://lists.ibiblio.org/sympa/arc/homestead
Archive powered by MHonArc 2.6.24.