hard to get any ventilation under it. Area it sits on (like most of
clay-filled property called soil) is wet when it rains. Off the
ground works, but I think that completely covered but with a breeze, and a complete
summer (6 months) all but the most wet White Oak will be ready to
burn.> Found out that 16x8 would require a building permit and 12x12
concrete pad would cost a bundle ($1200). Think I will go really
cheap with some footers and gravel for the surface. Maybe even go
with plastic pipes and clear plastic cover for a year...
Archive powered by MHonArc 2.6.24.