A global boom in construction and rebuilding in Florida hammer
remodelers' budgets.
By Jeff Bertolucci
Special to The Times
January 30, 2005
A painting contractor by trade, Don Dellino knows a lot more about
residential remodeling than your average homeowner. But even he was
startled by the recent run-up in construction costs due in large part to
soaring prices of building materials. Dellino and his wife are expanding
their two-bedroom Manhattan Beach home into a 3,900-square-foot
Italian-style villa.
"One bid for the roof was $14,000 higher if I decided to use copper
flashing," said Dellino, who opted for the less expensive -- if less
attractive -- galvanized metal. Despite his cost-cutting, however,
Dellino's home makeover will wind up costing about $450,000,
significantly higher than his own original estimate of $300,000.
The sharply rising cost of materials is creating a financial headache
for homeowners planning everything from simple maintenance projects to
full-scale renovations. Remodelers such as Dellino are opting, in part,
for cheaper materials to contain costs. But most are digging deeper into
their pockets and paying more. Homeowners are finding that some
contractors are shortening the expiration dates on their bids or adding
contractual clauses to protect themselves from price hikes in materials.
Since the spring of 2003, skyrocketing prices for construction supplies
-- including cement, drywall, lumber and nails -- have swelled the cost
of building a new house by about $7,000, according to Michael Carliner,
an economist with the National Assn. of Home Builders, an industry trade
group in Washington, D.C.
"The biggest component of that has been the increase in wood products,"
Carliner said.
Of course, consumer prices in general increased last year. Food rose
2.7% and energy costs, including gasoline, escalated 17%, according to
the Department of Labor's consumer price index.
But construction materials have climbed even more steeply, according to
NAHB statistics. Nationwide, lumber prices jumped about 27% in 2004,
said the NAHB, while scrap steel -- used in nails, wire mesh and other
building materials --* *rose 80% and cement, 6%. For consumers, that
translates into higher prices for nails, drywall and boards at checkout
stands and higher bids from contractors.
In Los Angeles County, the price of plywood jumped 47.5% last year.
Steel studs (sometimes used in place of framing lumber) shot up 37%, and
lumber climbed 21%, according to Marshall & Swift, a research firm that
provides the insurance industry with building cost data. Orange,
Riverside, San Bernardino and Ventura counties experienced similar
increases.
Prices have risen for numerous reasons. Rebuilding efforts in Florida,
which suffered a series of destructive hurricanes last year, have
siphoned away much of the available cement, a situation that may not
improve until spring, the NAHB said.
Large-scale projects in China have tapped a large portion of the world's
steel, and political squabbles -- including a 3-year-old U.S.-Canada
trade dispute over softwood lumber -- have added to price volatility.
Tsunami-related rebuilding in Asia is unlikely to affect North American
materials prices this year, however, as builders in the devastated areas
will likely use local or regional materials, according to the home
builders' trade group.
The good news: Prices may stabilize or drop early this year,
particularly once Florida acquires all the materials it needs for
post-hurricane rebuilding, the NAHB said.
Despite the higher prices, Southern California home remodelers and
contractors report that business is brisk -- although adding that some
homeowners are having second thoughts about proceeding with room
additions, kitchen expansions and other projects upon learning that
remodeling costs will far exceed their budgets.
"The phone is still ringing off the hook. People still need the work
done," said Karen Zieba, vice president of Zieba Builders Inc., a
design-build firm in Long Beach. "But fewer people are actually having
it done, because they can't afford it."
Homeowners hoping to add a room or remodel a kitchen often have
expectations that are "way out of whack" with what things cost, Zieba
added. "A homeowner may have a number -- $200,000 -- in his head. And
then we and our competitors bid it, and it's more like $350,000. They're
aghast."
Higher materials prices are "putting a dent in the affordability of the
projects out there," said Norm Kramer, certified remodeler and owner of
Oakwood Remodeling & Construction in Bonsall, Calif.
One of Kramer's potential clients wanted to build a 640-square-foot
guest house on her property, a project she had budgeted at $80,000, or
$125 per square foot.
"That's fine for a shell, but you're not going to get much beyond that,"
said Kramer, who estimates the median price for a remodel/expansion at
$200 to $225 per square foot.
One way to manage cost overruns is to plan for them. The National Assn.
of the Remodeling Industry, a trade group in Des Plaines, Ill.,
recommends that once homeowners have determined a remodeling budget they
set aside 10% to 20% of the total and place those funds in a reserve
account to cover added expenses. *
*Despite the cost of materials, home improvement remained popular last
year, as rising housing prices, increased homeowner equity and low
interest rates gave consumers the financial means to upgrade. Americans
spent $224 billion on remodeling projects in 2004, up from $214 billion
in 2003, according to the remodeling association.
And, similar to what consumers see at the gas pump, materials prices
tend to fluctuate a lot.
"Pricing for lumber can change from week to week," said Bob Leon,
general contractor and owner of Pro Builders Express in La Mirada.
For homeowners, this has meant less time to mull over a contractor's
bid. To protect themselves against a sudden upsurge in materials costs,
contractors are shortening the expiration dates on their bids. "We were
at 30 days, and now we're down to 15 days," Kramer said.
Los Angeles general contractor Bill Simone's deadline is even shorter.
"When we put together a proposal for our potential clients, it's good
for seven days."
Equally troubling for homeowners are contractual clauses that protect
contractors from materials price hikes.
"You can put in the contract that, if costs go up, we can be
reimbursed," Kramer said. "People don't like to see that, but it's one
of those things you try to protect yourself on."
Of course, the average homeowner doesn't track the price of ready-mix
concrete and asphalt shingles.
"I know what I spent, but I don't know if that steel girder I put to
support the roof was three times more expensive than it would have been
three years ago," said Chris Reedy, a financial advisor in Corona del
Mar who two years ago -- just about the time the rise in drywall,
plywood and steel studs started -- gutted his 2,700-square-foot 1955
home to bring it up to 2003 standards. "I'm just surprised at how
expensive things get when you start putting in granite countertops."
Indeed, the time-worn axiom remains true.
"The thing about remodeling," Simone said, "is that it always costs more
than you expect, and takes longer than you anticipated."
*
(BEGIN TEXT OF INFOBOX)
Sticker shock
The prices of many building supplies surged from 2003 to 2004 in Los
Angeles County. For example: